Bathroom Renovation in Mumbai
A bathroom renovation without a flood test before tiling is a renovation you will do again.
Free site visit
Measured survey and an itemised quote, at no cost.
About bathroom renovation
Bathrooms are where concealed services fail and where redoing the work is most expensive. We replace concealed plumbing in CPVC, waterproof the floor and 600 mm up the walls, flood test for 48 hours, and only then tile.
What we specify
How we run the work
Free site survey
Measured survey plus opening up a wet wall and an electrical point to see what is actually there.
Services assessment
Incoming line material, DB capacity, drain stack condition and load calculation.
Society clearance check
Working hours, lift rules, debris removal and permitted days confirmed in writing.
Itemised quotation
Known scope priced line by line, with provisional sums named separately for the unknowns.
Bathroom Renovation — questions
How long is the bathroom out of use?
18 to 25 days for a full renovation. The waterproofing and flood test account for about a week of that and cannot be compressed without accepting real risk.
Should I replace the concealed plumbing?
In a flat over 20 years old, yes. The pipe is behind tile you are already removing — doing it now costs a fraction of doing it later, when it means breaking a new bathroom.
Other home renovation services
Flat Renovation
In an older flat the budget is decided by what is behind the walls, which is why we open them before quoting.
Read more →Kitchen Renovation
The right time to move a kitchen's plumbing is when the counter is already coming out. There is no cheaper moment.
Read more →Full Home Renovation
Doing everything at once costs less per room and takes less total time than doing it in phases.